Weekly chronam production load
Hey all, I have another set of new and replacement batches ready to load from the chronam ftp into the production chronam site. There are some special instructions for this one. Thank you so much!
-
1. I have some replacement batches to replaced in chronam. They are in the replacement_batches folder. These will have to be done first before the new batches, otherwise the new batches won't load properly. -
2. The new batches to be loaded are in the new_batches folder. They should be done after the replacement batches are complete. -
3. There is a single json file to be loaded in the json_files folder. This should be added with the new batches. -
4. I have one batch that needs to be purged from chronam with no replacement: batch_gua_awc1892_ver01
I appreciate it as always. -Donnie
Edited by Seamus Narron